- Existing Armfield press box before demolition.
- Underground Trenching began In January 2006.
- Footers were poured the third week of march 2006 and were poured as much as 10' deep because of soil issues.
- The main concrete pad was poured fourth week of march 2006.
- CMU walls were started the fifth week of March 2006.